202393 - ALDI Truganina - Cantiere del progetto pubblico
-
12th settembre 2024, Site control, Site access, Project defects.
Morning everyone.
Allegati :
From COB today the Aldi Truganina site will be under the control of Aldi.
The store will be opened between 7am and 3.30pm each day including this Saturday. If you need access outside of these times you need to give as much notice as possible (no less then 24hrs).
Aldi’s expectation is that we are completed and off site by COB Friday 20th (AT THE LATEST). This includes all defect rectification (lists attached), commissioning etc.
Our site compound is being dismantled and temporary amenities will be made non-operational from Monday morning.
If you have any questions, concerns etc please just give me a buzz.
4088 M-Site Visit (09-10-2024).pdf
4088 H-Site Visit (09-10-2024).pdf
Meteo attuale del cantiere
Non disponibile
Fuso orario - Ora standard dell’Australia orientale
Previsioni - sabato, 23 novembre
Shower or two.
Min: 17C Max: 28C
Possibilità di pioggia: 70%
Precipitazioni previste: 0 a 8mm
Luogo previsioni - Tullamarine, VICTORIA
Fuso orario - Ora standard dell’Australia orientale
Domani - domenica, 24 novembre
Shower or two.
Min: 15C Max: 25C
Possibilità di pioggia: 70%
Precipitazioni previste: 0 a 8mm
Conosci i requisiti dei DPI per questo cantiere?
Assicurati di avere l'equipaggiamento di sicurezza corretto per il primo giorno in cantiere.
Inizia a lavorare prima quando arrivi sul cantiere.
Completa la registrazione del cantiere online con la massima comodità e risparmia tempo.
Conosci i requisiti dei DPI per questo cantiere?
Assicurati di avere l'equipaggiamento di sicurezza corretto per il primo giorno in cantiere.
Inizia a lavorare prima quando arrivi sul cantiere.
Completa la registrazione del cantiere online con la massima comodità e risparmia tempo.